Expand All | Collapse All


Total Time: 144 minute(s)

Raw Materials
 Wood x 21  
 Crude Oil x 2  
 Lauan x 2  
 Iron Ore x 30  
 Oak x 2  

Tasks
 Heavy Oil x 2 (40 minute(s) with Crude Oil Equipment)
 Lubricant x 2 (24 minute(s) with Centrifuge)
 Metal Gear x 1 (3 minute(s) with Melting Furnace)
 Small Wooden Gear x 4 (0 minute(s) with Wooden Saw)
 Oak Wood x 3 (0 minute(s) with Stone Knife)
 Medium Wooden Gear x 6 (12 minute(s) with Rope Saw)
 Lauan Wood x 4 (0 minute(s) with Stone Knife)
 Big Wooden Gear x 2 (8 minute(s) with Rope Saw)
 Link Gear Unit x 1 (2 minute(s) with Great Driver)
 Charcoal x 10 (10 minute(s) with Low-Temperature Kiln)
 Ordinary Wood x 39 (0 minute(s) with Stone Knife)
 Firewood x 77 (0 minute(s) with Stone Knife)
 Iron Material x 15 (30 minute(s) with Melting Furnace)
 Steel x 5 (10 minute(s) with Hot Kiln)
 Landing Plate x 1 (5 minute(s) with Melting Furnace)

New Manufacture | Edit | Back