Expand All | Collapse All


Total Time: 3 minute(s)

Raw Materials
 Cotton x 2  

Tasks
 Cotton Thread x 2 (2 minute(s) with Spinning Machine)
 Cotton Cloth x 1 (1 minute(s) with Loom)

New Manufacture | Edit | Back